Project Details
Client: City of Clovis
Location: Clovis, California
Type: Wastewater Pump Station
Completion Date: 2006
Construction Cost: $11 million
Interesting Fact: The pump station design includes an aesthetically pleasing prairie style house that completely encloses all mechanical equipment, an advanced odor control system, flow metering capabilities and a 400 kilowatt diesel generator.
View other projects in this expertise
Blair, Church & Flynn assisted the City of Clovis with the design of Wastewater Pump Station E, which includes two 30 horsepower and one 100 horsepower variable speed non-clog pumps. The pump station design includes an aesthetically pleasing prairie style house that completely encloses all mechanical equipment, an advanced odor control system, flow metering capabilities and a 400 kilowatt diesel generator.
Blair Church & Flynn provided a peer review of the Plans and Specifications during preliminary and final design stages and also assisted the City of Clovis in developing valve positioning drawings for various pumping scenarios.

