Lundy Lake Intake Pipeline Rehabilitation

 
1 2 3 4 5 6 7

Project Summary

Blair, Church & Flynn performed an evaluation of the primary pipeline responsible for conveying water through the Lundy Lake Dam and prepared construction documents for rehabilitation using high density polyethylene (HPPE) pipe. The work also involved the design of a 36-inch knife gate controlled by high pressure air cylinders positioned thirty feet below the water surface, a new solar power system and support for remote operations.