Fresno Irrigation District Facility Improvements

 
1 2 3 4 5 6

Project Summary

Blair, Church & Flynn is proud to have assisted the Fresno Irrigation District for the past 30 years with numerous improvements to their system's facilities. These projects have included pipeline replacements, control structure modifications, long crested weirs, concrete lining, as well as numerous analyses and studies.